Project Highlight Newsome has successfully delivered the installation and commissioning of a high-performance 400 kW chiller at a major confectionery manufacturing site in York. Designed to advance ESG targets, the installation enhances system dependability while minimising overall power consumption and CO₂ discharge. https://sparxsocial.com/story11230851/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-reduction